Infrastructure - May 20, 2026, 6:20 PMAsunción Mayor Inspects Storm Drainage Works in Santo Domingo BasinMayor Luis Bello checked the progress of storm drainage works in the Santo Domingo Basin, which have reached 30% completion with municipal funds. The intervention aims to solve historic flooding in the area.